Welcome to the article Newhard Company assigns overhead cost to jobs on the basis of 125 of direct labor cost The job cost sheet for Job 313 includes 10. On this page, you will learn the essential and logical steps to better understand the topic being discussed. We hope the information provided helps you gain valuable insights and is easy to follow. Let’s begin the discussion!
Answer :
Answer:
The overhead cost assigned to Job 313 can be calculated by multiplying the direct labor cost by 125%:
Overhead cost = $12,000 * 125% = $12,000 * 1.25 = $15,000
The total cost of Job 313 can be calculated by adding the direct materials cost, direct labor cost, and overhead cost:
Total cost = $10,000 + $12,000 + $15,000 = $37,000
The cost per unit can be calculated by dividing the total cost by the number of units produced:
Cost per unit = $37,000 / 1,000 units = $37 per unit
Thank you for reading the article Newhard Company assigns overhead cost to jobs on the basis of 125 of direct labor cost The job cost sheet for Job 313 includes 10. We hope the information provided is useful and helps you understand this topic better. Feel free to explore more helpful content on our website!
- What is the perimeter of the figure 32 0cm 51 0cm 19 0cm 63 0cm.
- The sign shows when a lift is safe to use the total mass of people should be 480 kg or less Fred and some other.
- The sign shows when a lift is safe to use the total mass of people should be 480 kg or less Fred and some other
Rewritten by : Brahmana